Summary: A semiconductor supplier wanted to produce wafer carriers locally for the Singapore market. 80 employees, €20m revenue potential, ISO 14644 cleanroom – and no existing quality system. Gregor Specht took over the overall concept, training and project steering through to customer release.
6 mo.
Ramp-up to SOP
0
critical audit findings
80
staff trained & qualified
–50%
labour cost vs. DACH

Situation

A wafer carrier manufacturer wanted to shift production into the Singapore–Batam corridor — not only to reduce costs, but to supply Singapore customers locally. Local sourcing had become a strategic requirement from their buyers.

The production environment: ISO 14644 cleanroom, 80 employees at the Batam site, revenue volume €20m. The problem: no existing quality system, no established compliance framework, and a tight deadline for the first customer release.

Challenges

Approach

Phase 1 · Weeks 1–4: Analysis & Concept

Full assessment of the current state: cleanroom infrastructure, process steps, qualification level of the workforce, customer requirements. Output: consolidated master concept with prioritisation by customer risk.

Phase 2 · Weeks 5–14: Training & Q-Standards

Structured training programme for 80 employees: cleanroom behaviour, quality documentation, SEMI standards, defect classification. Training materials in English and Bahasa Indonesia — practical, without excess paperwork.

Phase 3 · Weeks 15–22: Qualification & Customer Release

Steering of IQ/OQ/PQ phases. Direct support during customer audits. Coordination of all open items between local team, production and customer side. Escalations addressed early — no surprises in the audit.

Phase 4 · Week 24: SOP

Stable series production achieved, customer release granted, handover to local management. 0 critical findings in the final audit.

Results

MetricResult
Ramp-up to SOP6 months (target met)
Critical audit findings0
Production interruptions0
Staff trained80
Cleanroom class achievedISO 14644 certified
Labour cost difference vs. DACH–50%
Revenue potential unlocked€20m

Success Factors

"Cleanroom ramp-ups don't fail because of technology. They fail because no one steers the complete picture." – Gregor Specht

Context: Singapore–Batam Corridor

Batam is 45 minutes by ferry from Singapore. Labour costs 50% below DACH levels, first-class free trade zone, direct access to Singapore customers. For semiconductor suppliers with a Singapore customer base, Batam is the logical production location.

Gregor Specht has worked in this corridor for years — with a local network, intercultural experience and the technical background for cleanroom and semiconductor production.

Planning local sourcing in ASEAN or a cleanroom ramp-up?
First conversation free. Direct. No pitch.

contact@specht-projects.com  ·  Book a Strategy Call